Parking Study (and 200 Queens Quay Parking Lot)

In 2020 the Waterfront BIA engaged WSP engineering to develop a parking study to review the parking situation along Queens Quay with the planned removal or reduction of major parking lots in the corridor. BIA staff are currently engaged in implementing or evaluating options for a number of recommendations within the WSP report.  

Download 

  • Waterfront BIA Parking Study prepared by WSP (2020) 
  • Letter to City Planning and Diamond Corp. on 200 Queens Quay initial plans – mitigation of parking impacts and the importance of a safer, accessible ‘Gateway’ opportunity at Simcoe Underpass (September 2020) 